White marker Company
White line
White marker The "5P-Management"
White line
White marker Products
White line
White marker Industries
White line
White marker Services
White line
White marker Spare parts inquiry       
White line
White marker Contact
White line
Red marker - current page DESMA up-to-date
White line
White marker Login
Red marker - current page News / Innovations Blue arrow, pointing at the right side
White line
White marker Press Blue arrow, pointing at the right side
White line
White marker Upcoming shows Blue arrow, pointing at the right side
Red marker  

News / Innovations

New systems for efficient tool changes in small series.

Manual quick clamping systemSmall batches often require frequent tool changes. Together with heating and cool-down times, tool changes can often take many hours. Hours in which the injection moulding machine is idle. The consequence are disproportionately high machine set up costs in the product cost calculation. For several years now, DESMA has offered a range of different tool change systems.

These comprise autonomous pre-heating stations for one or more tools. Even cold runners can be held at operating temperature in these pre-heating stations. Used in conjunction with one of DESMA's change carriages or hydraulic/mechanical fast clamping systems, the tool changing times can be reduced to less than 15 minutes from shot to shot.

Quick coupling system for feed lines to tool and cold runnersPre-heating stations are equipped with an autonomous controller. This allows the entry of a heating time and exact temperature specifications. Another option is to connect an integrated mould heating unit. If a cold runner is to be pre-heated, suitable temperature control units with fast coupling systems are available. Tools are pre-heated using heating plates identical with those fitted in the machines. The upper heating plate of the pre-heating station is moved into position on the mould using a spindle drive.

In order to transport the tool from the change carriage into the mould frame in the injection moulding machine using the lowest forces possible, the machine hot plates are fitted with heavy load rollers. As an alternative, the hot plates can also be designed with air cushion plates. The change carriage is docked on the mould frame using consoles. To simplify the positioning process, a cross-stroke is also available. A further option is for the insertion of the mould from the change carriage into the mould frame to be executed by an integrated automated pusher. Pre-heating stations are available for a wide range of mould sizes. The systems are furthermore fully enclosed to keep energy losses to a minimum.




 
[back to overview]


Print page Print page (change to landscape please)
 
Klöckner DESMA
Elastomertechnik GmbH
An der Bära
78567 Fridingen
Germany